New-build Roofing

On programme, on pattern, and signed off for the consent file.

On a new build the roof has to land in the right week — after the framing inspection, before the linings, and without holding up the plumber and sparky. We take off from the plans, order sheets cut to length, and turn up when the frame is ready. Underlay, sheets, flashings and ridging go on to the manufacturer's fixing pattern, and you get the documentation your building consent file needs.

What’s included

  • Material take-off from plans
  • Profile and colour confirmation with owner and builder
  • Roof underlay and long-run steel sheets
  • All flashings, ridging and penetration details
  • Fixing to manufacturer's pattern and wind-zone requirements
  • Producer statement / documentation for the consent file

Ready to get it done properly?

Design your finish in the texture picker, or get a free, no-obligation quote today.