Bathroom Plumbing & Fit-out
New bathroom, ensuite or laundry — plumbed properly from rough-in to fit-off.
A bathroom reno lives or dies on what's behind the wall. We rough-in supply, waste and vent pipework to suit your new layout, pressure-test before the linings go on, and come back to fit-off your vanity, toilet, shower and bath once the tiler's done. We coordinate with your builder, tiler and sparky so the job flows and the sequence is right.
What’s included
- Layout and fixture-position consultation
- Rough-in of hot, cold, waste and vent pipework
- Pressure test before linings close in
- Fit-off of vanity, toilet, shower, bath and tapware
- Shower mixer, floor waste and tempering valve to code
- Coordination with builder, tiler and electrician
- Final commissioning and leak check
Ready to get it done properly?
Design your finish in the texture picker, or get a free, no-obligation quote today.