Bathroom Plumbing & Fit-out

New bathroom, ensuite or laundry — plumbed properly from rough-in to fit-off.

A bathroom reno lives or dies on what's behind the wall. We rough-in supply, waste and vent pipework to suit your new layout, pressure-test before the linings go on, and come back to fit-off your vanity, toilet, shower and bath once the tiler's done. We coordinate with your builder, tiler and sparky so the job flows and the sequence is right.

What’s included

  • Layout and fixture-position consultation
  • Rough-in of hot, cold, waste and vent pipework
  • Pressure test before linings close in
  • Fit-off of vanity, toilet, shower, bath and tapware
  • Shower mixer, floor waste and tempering valve to code
  • Coordination with builder, tiler and electrician
  • Final commissioning and leak check

Ready to get it done properly?

Design your finish in the texture picker, or get a free, no-obligation quote today.